Getting a Septic Permit in Miami-Dade: The Documents You’ll Need

Written by

in

Most septic permit delays in Miami-Dade come down to one thing: incomplete submittals. Here is the exact information we ask every client for before we start a design — gather it early and your project moves faster.

New Construction or Commercial Development

For commercial construction, especially new developments, permits are essential from day one. Site selection matters: the right location and design produce a more efficient, longer-lasting system. Bring your architectural site plan and floor plan to the first conversation.

Replacing or Modifying an Existing System

For a property evaluation we need:

  1. An inspection of the existing system
  2. A survey with elevation information
  3. Five months of water bill records — real usage data drives correct sizing

New System Design

  1. Architectural floor plan
  2. Architectural site plan
  3. Survey elevation details
  4. Plumbing plan

The Forms

Florida’s DH4015 application package (all four pages plus instructions) is available for download on our Resources page, along with Miami-Dade DERM site plan documents. Not sure which apply to you? That’s part of our service — we prepare and submit the package.

This article is general information, not engineering or legal advice for a specific property. Requirements change — always confirm current rules with Miami-Dade RER/DERM or consult a licensed Professional Engineer about your project.